EAPC Middle East

 

Location EAPC MIDDLE EAST
Product
RETROWRAP
Date NOV. 2000 - FEB. 2001

 

 

 

Underwater Pile Cleaning Operations
Underwater Pile Cleaning Operations

 

Diver working on the surface, hand scraping marine growth
Diver working on the surface, hand scraping marine growth


Diver using air driven “Whirlaway” to final clean pile
Diver using air driven "Whirlaway" to final clean pile

 

Self propelled work platform. Note wrap on deck, folded ready for installation - factory fitted fasteners clearly visible
Self propelled work platform. Note wrap on deck, folded ready for installation - factory fitted fasteners clearly visible

 

Wrap lowered into position using grab handles. Note inner sealing face of flange clearly visible
Wrap lowered into position using grab handles. Note inner sealing face of flange clearly visible


Line up rod being fitted
Line up rod being fitted

 

Tightening top caliper
Tightening top caliper

 

Line up rod and top caliper in position
Line up rod and top caliper in position


Second caliper being handed to diver
Second caliper being handed to diver

 

Underwater tensioning operation in progress
Underwater tensioning operation in progress

 

Inshore pile cleaning underway
Inshore pile cleaning underway

 

Fitting line up rod into flanges
Fitting line up rod into flanges
Note sealing faces and grab handle clearly visible

 

Wrap secured in place in surf
Wrap secured in place in surf

 

Tensioning operation in progress
Tensioning operation in progress

 

Wrap fully installed. Note: grab handle will be removed at this location
Wrap fully installed. Note: grab handle will be removed at this location

 

Installed wrap on vertical and batter piles
Installed wrap on vertical and batter piles

 

Finished structure
Finished structure


Large diameter one-piece wraps on mooring dolphin
Large diameter one-piece wraps on mooring dolphin
Note center wrap installed with less than 10" (250mm) clearance to outer piles

 

Complete assembly
Complete assembly
Jetty No. 1 in background