BP Lomond

Operator BRITISH PETROLEUM
Location LOMOND – CATS PLATFORM, NORTH SEA
Installation Method ROPE ACCESS (NO SCAFFOLDING)

Contractor

OIS ABERDEEN
Product
RETROWRAP HD (6.25mm)
High
Tempurature
508mm GAS RISER NO. PL780, 219mm DIAMETER CONDENSATE RISER NO. PL781
Operation RECLADDING RISERS FROM DEAD WEIGHT SUPPORT FLANGE UPWARDS TO RISER CLAMP APPROXIMATELY 6m EACH RISER
Date OCTOBER 2002

The extent of coating repair both risers from dead weight support flange bottom center and center to underside of riser clamps top center 20” high temperature gas riser in foreground
(1)
The extent of coating repair both risers from dead weight support flange bottom center and center to underside of riser clamps top center 20” high temperature gas riser in foreground. Note: Fabric lifting lugs for slinging units into position clearly visible.

 

Fabric lifting lugs for slinging units into position clearly visible.
(2)

Full-length closure flanges and overlap interconnecting joints clearly visible together with SS 316L bolting system
(3)
Full-length closure flanges and overlap interconnecting joints clearly visible together with SS 316L bolting system.

 

fulle length closure flanges
(4)


Dual diameter 244/219 transition unit has been lowered onto dead weight support flange. Note: Draw bolts pre fitted into closure flange.
(5)
Dual diameter 244/219 transition unit has been lowered onto dead weight support flange. Note: Draw bolts pre fitted into closure flange.

 

Dual diameter transition unit fully installed. Factory thermal formed flanges visible at neoprene steel interface. Multi bolts at high stress area.
(6)
Dual diameter transition unit fully installed. Factory thermal formed flanges visible at neoprene steel interface. Multi bolts at high stress area.

 

Lifting lugs clearly visible on 244/219 diameter transition unit.
(7)
Lifting lugs clearly visible on 244/219 diameter transition unit.

 

533/508mm transition unit pre fitted onto existing cutback neoprene riser cladding. Draw bolts in position awaiting tensioning.
(8)
533/508mm transition unit pre fitted onto existing cutback neoprene riser cladding. Draw bolts in position awaiting tensioning. Note: Inner vertical seal clearly visible together with white high temperature (120 ° corrosion inhibiting gel).


Close up showing condition of substrate and the fact that minimum substrate preparation is required prior to installation of Retrowrap units.
(9)
Close up showing condition of substrate and the fact that minimum substrate preparation is required prior to installation of Retrowrap units.

 

Both risers. Full-length 2794mm partially pre fitted over 219 condensate riser. Lower four draw bolts to be fitted. Note: Coating damage on 20” high temperature riser.
(10)
Both risers. Full-length 2794mm partially pre fitted over 219 condensate riser. Lower four draw bolts to be fitted. Note: Coating damage on 20” high temperature riser.


Full-length 2794mm unit in pre position over sealing skirt of lower unit.
(11)
Full-length 2794mm unit in pre position over sealing skirt of lower unit. Upper end of lower closure flange and lifting lugs visible bottom center.

 

Completed interconnecting joint showing thixotropic corrosion
(12)
Completed interconnecting joint showing thixotropic corrosion inhibiting gel exuding from flange and circumferential joint during final tensioning.


Pre installed wrap with draw bolts in position awaiting closure by air operated impact wrench.
(13)
Pre installed wrap with draw bolts in position awaiting closure by air operated impact wrench. Note: Boots of rope access abseiler.