BP Lomond
| Operator | BRITISH PETROLEUM |
| Location | LOMOND – CATS PLATFORM, NORTH SEA |
| Installation Method | ROPE ACCESS (NO SCAFFOLDING) |
Contractor |
OIS ABERDEEN |
| Product | RETROWRAP HD (6.25mm) |
| High Tempurature |
508mm GAS RISER NO. PL780, 219mm DIAMETER CONDENSATE RISER NO. PL781 |
| Operation | RECLADDING RISERS FROM DEAD WEIGHT SUPPORT FLANGE UPWARDS TO RISER CLAMP APPROXIMATELY 6m EACH RISER |
| Date | OCTOBER 2002 |

(1)
The extent
of coating repair both risers from dead weight support flange bottom center and center to
underside of riser clamps top center 20” high temperature gas
riser in foreground. Note: Fabric lifting lugs for slinging units into position clearly visible.

(2)

(3)
Full-length closure flanges and overlap interconnecting joints clearly visible
together with SS 316L bolting system.

(4)

(5)
Dual diameter 244/219 transition unit has been lowered onto dead weight support
flange. Note: Draw bolts pre fitted into closure flange.

(6)
Dual diameter transition unit fully installed. Factory thermal formed flanges
visible at neoprene steel interface. Multi bolts at high stress area.

(7)
Lifting lugs clearly visible on 244/219 diameter transition unit.

(8)
533/508mm transition unit pre fitted onto existing cutback neoprene riser
cladding. Draw bolts in position awaiting tensioning. Note: Inner vertical seal clearly visible
together with white high temperature (120 ° corrosion inhibiting gel).

(9)
Close up showing condition of substrate and the fact that minimum substrate
preparation is required prior to installation of Retrowrap units.

(10)
Both risers. Full-length 2794mm partially pre fitted over 219 condensate
riser. Lower four draw bolts to be fitted. Note: Coating damage on 20” high temperature riser.

(11)
Full-length 2794mm unit in pre position over sealing skirt of lower unit.
Upper end of lower closure flange and lifting lugs visible bottom center.

(12)
Completed interconnecting joint showing thixotropic corrosion inhibiting
gel exuding from flange and circumferential joint during final tensioning.

(13)
Pre installed wrap with draw bolts in position awaiting closure by air operated
impact wrench. Note: Boots of rope access abseiler.