Alcoa Jetty Refurbishment


Operator ALCOA JETTY REFURBISHMENT
Location JAMAICA


Retrowrap H Pile outer jacket with associated pre felted pre gelled filler blocks being loaded on work barge.
Retrowrap H Pile outer jacket with associated pre felted pre gelled filler blocks being loaded on work barge.

 

Full length one piece outer jacket with lag fasteners pre installed.
Full length one piece outer jacket with lag fasteners pre installed.
Note: Ident tag attached to jacket to ensure correct installation location.

 

Temporary work platform attached to pile to permit upper pile cleaning and attachment of upper seal collar against pile cap.
Temporary work platform attached to pile to permit upper pile cleaning and attachment of upper seal collar against pile cap.

 

Full length outer jacket installed.
Full length outer jacket installed.
Note: Radius contour visible across pile flat face.



 

Jacket and filler blocks installed on 14 inch vertical and raker piles
Jacket and filler blocks installed on 14” vertical and raker piles.

 

Raker pile cap termination
Raker pile cap termination.

 

Vertical pile cap termination
Vertical pile cap termination.


Vertical Pile Jacket showing outline (under fabric) of pile cap top seal. Seated at pile/pile cap high stress interface
Vertical Pile Jacket showing outline (under fabric) of pile cap top seal
Seated at pile/pile cap high stress interface